Quiz-summary
0 of 30 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
Information
PRINCE2 – Practitioner Exam Premium Access
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 30 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- Answered
- Review
-
Question 1 of 30
1. Question
Which process provides information that the project board uses when deciding whether to initiate the project?
Correct
The project manager creates the project brief, which the project board reviews when deciding whether to authorize the initiation of the project, during the starting up a project process. The project brief defines and scopes the project at a high level. It answers basic questions, such as why the project is being done, what the project is to deliver, who will be involved with the project, when the project will start and finish, and which approach will be used to deliver the products.
Incorrect
The project manager creates the project brief, which the project board reviews when deciding whether to authorize the initiation of the project, during the starting up a project process. The project brief defines and scopes the project at a high level. It answers basic questions, such as why the project is being done, what the project is to deliver, who will be involved with the project, when the project will start and finish, and which approach will be used to deliver the products.
-
Question 2 of 30
2. Question
In a small project, it may be appropriate for the project manager to also carry out the responsibilities of which of the following roles?
Correct
In a small project, the project support and the project manager roles can be combined. The project support role is the responsibility of the project manager. The project manager can delegate the work of project support to a separate person or people. If no one is available to delegate project support activities to, the project manager will need to carry them out himself.
Incorrect
In a small project, the project support and the project manager roles can be combined. The project support role is the responsibility of the project manager. The project manager can delegate the work of project support to a separate person or people. If no one is available to delegate project support activities to, the project manager will need to carry them out himself.
-
Question 3 of 30
3. Question
From the options outlined below, which of the following is a purpose of the organization theme?
Correct
One purpose of the organization theme is to define the project’s approach to communicating and engaging with the stakeholders. This is documented in the communication management approach (option C). Option A is a purpose of the risk theme Option B is a purpose of the plans theme. Option D is a purpose of the quality theme.
Incorrect
One purpose of the organization theme is to define the project’s approach to communicating and engaging with the stakeholders. This is documented in the communication management approach (option C). Option A is a purpose of the risk theme Option B is a purpose of the plans theme. Option D is a purpose of the quality theme.
-
Question 4 of 30
4. Question
Which of the following statements is true of project assurance?
Correct
Each role on the project board—the executive, the senior user, and the senior supplier— has a project assurance responsibility aligned to its area of interest (option A). Options B and C are incorrect—project assurance is responsible for auditing the project manager and project support, so neither of these roles can also do project assurance, as this would create a conflict of interest. Option D is incorrect—the project manager is responsible for creating the communication management approach.
Incorrect
Each role on the project board—the executive, the senior user, and the senior supplier— has a project assurance responsibility aligned to its area of interest (option A). Options B and C are incorrect—project assurance is responsible for auditing the project manager and project support, so neither of these roles can also do project assurance, as this would create a conflict of interest. Option D is incorrect—the project manager is responsible for creating the communication management approach.
-
Question 5 of 30
5. Question
From the options itemized below, who does the senior supplier represent when making decisions?
Correct
The senior supplier is responsible for ensuring that the project’s products have the technical integrity to meet the users’ needs (option D). Option A is incorrect— the senior user represents those who will benefit from using the products. Option B is incorrect— corporate, programme management, or the customer is responsible for commissioning the project. Option C is incorrect—the executive is responsible for ensuring that the project is following a cost-conscious approach.
Incorrect
The senior supplier is responsible for ensuring that the project’s products have the technical integrity to meet the users’ needs (option D). Option A is incorrect— the senior user represents those who will benefit from using the products. Option B is incorrect— corporate, programme management, or the customer is responsible for commissioning the project. Option C is incorrect—the executive is responsible for ensuring that the project is following a cost-conscious approach.
-
Question 6 of 30
6. Question
Which PRINCE2 management product helps establish a controlled flow of information between all the project stakeholders?
Correct
The communication management approach facilitates engagement with stakeholders through the establishment of a controlled and bidirectional flow of information. The communication management approach details the requirements for reporting to the project’s stakeholders, including the stakeholders who must be notified of the project closing.
Incorrect
The communication management approach facilitates engagement with stakeholders through the establishment of a controlled and bidirectional flow of information. The communication management approach details the requirements for reporting to the project’s stakeholders, including the stakeholders who must be notified of the project closing.
-
Question 7 of 30
7. Question
Which of the following level of management would authorize any deviation that exceeds stage tolerances?
Correct
The project board represents the directing level of management. They allocate stages with associated tolerances to the project manager. If the project manager realizes that a stage will breach those stage tolerances, he must escalate this situation to the project board, which has the authority to authorize any deviation that exceeds stage tolerances (as long as the situation does not also exceed project tolerances, in which case corporate, programme management, or the customer would need to authorize the deviation).
Incorrect
The project board represents the directing level of management. They allocate stages with associated tolerances to the project manager. If the project manager realizes that a stage will breach those stage tolerances, he must escalate this situation to the project board, which has the authority to authorize any deviation that exceeds stage tolerances (as long as the situation does not also exceed project tolerances, in which case corporate, programme management, or the customer would need to authorize the deviation).
-
Question 8 of 30
8. Question
Which of the options outlined below is a minimum requirement for applying the organization theme?
Correct
A minimum requirement of the organization theme is to ensure that all the responsibilities in the PRINCE2 role descriptions are fulfilled (option D). Option A is incorrect—in some circumstances, where work is outsourced to an external company, that company might decide to set up their own project board, but this is not an organization theme minimum requirement. Option B is incorrect—when the project is part of a programme, the programme’s design authority might take on the role of change authority, but this is not an organization theme minimum requirement. Option C is incorrect—the project must ensure that all the responsibilities described in the PRINCE2 role descriptions are fulfilled, but sometimes one person might take on more than one role.
Incorrect
A minimum requirement of the organization theme is to ensure that all the responsibilities in the PRINCE2 role descriptions are fulfilled (option D). Option A is incorrect—in some circumstances, where work is outsourced to an external company, that company might decide to set up their own project board, but this is not an organization theme minimum requirement. Option B is incorrect—when the project is part of a programme, the programme’s design authority might take on the role of change authority, but this is not an organization theme minimum requirement. Option C is incorrect—the project must ensure that all the responsibilities described in the PRINCE2 role descriptions are fulfilled, but sometimes one person might take on more than one role.
-
Question 9 of 30
9. Question
Which of the following PRINCE2 role is responsible for securing the funding for the project?
Correct
The executive represents the business interest in the project. It is his responsibility to secure the funding for the project. It is very important to note that the executive represents the business perspective on the project board and is the ultimate decision-maker. He must secure the funding for the project and ensure that the project provides value for the money.
Incorrect
The executive represents the business interest in the project. It is his responsibility to secure the funding for the project. It is very important to note that the executive represents the business perspective on the project board and is the ultimate decision-maker. He must secure the funding for the project and ensure that the project provides value for the money.
-
Question 10 of 30
10. Question
Who among the following is responsible for specifying the benefits and subsequently realizing the benefits by using the project’s product?
Correct
The senior user is responsible for both forecasting the benefits from the project and then realizing the benefits by using the project’s products. The project manager will work with the senior users in order to create this management product. The project product description contains the customer’s quality expectations and the measurable acceptance criteria that the final products should conform to when finished.
Incorrect
The senior user is responsible for both forecasting the benefits from the project and then realizing the benefits by using the project’s products. The project manager will work with the senior users in order to create this management product. The project product description contains the customer’s quality expectations and the measurable acceptance criteria that the final products should conform to when finished.
-
Question 11 of 30
11. Question
An example of the business case being developed is best described by which of the following?
Correct
The executive creates the outline business case in the starting up a project process (option A). This is part of developing the business case. Option B is incorrect—this is an example of a verify activity. Option C is incorrect—this is an example of confirmed activity. Option D is incorrect—this is an example of a maintenance step.
Incorrect
The executive creates the outline business case in the starting up a project process (option A). This is part of developing the business case. Option B is incorrect—this is an example of a verify activity. Option C is incorrect—this is an example of confirmed activity. Option D is incorrect—this is an example of a maintenance step.
-
Question 12 of 30
12. Question
Which role is responsible for ensuring that the benefits forecast in the business case represents value for money and aligns with the organization’s objectives?
Correct
The executive ensures that the benefits forecast in the business case represents value for money and aligns with the organization’s objectives. The executive is focused on whether the project is providing good value for the money invested, whether the products of the project meet a business need that justifies the investment in the project, and whether an adequate return on the project’s investment will be achieved.
Incorrect
The executive ensures that the benefits forecast in the business case represents value for money and aligns with the organization’s objectives. The executive is focused on whether the project is providing good value for the money invested, whether the products of the project meet a business need that justifies the investment in the project, and whether an adequate return on the project’s investment will be achieved.
-
Question 13 of 30
13. Question
During which of the following processes is the outline business case refined into the detailed business case?
Correct
The detailed business case is created in the initiating a project process. During the initiating a project process, the project manager refines the outline business case to create the first detailed business case. The project manager also creates the benefits management approach, which describes how the achievements of the project’s benefits will be measured and what management actions might be required to ensure that the benefits will be realized.
Incorrect
The detailed business case is created in the initiating a project process. During the initiating a project process, the project manager refines the outline business case to create the first detailed business case. The project manager also creates the benefits management approach, which describes how the achievements of the project’s benefits will be measured and what management actions might be required to ensure that the benefits will be realized.
-
Question 14 of 30
14. Question
Which of the options outlined below represents an example of an output?
Correct
An output from a project is the specialist product the project produces. Option B, new computer software, might be an output from a project. Option A, benefits management approach, is an example of a management product, not a specialist product. Option C is the result of the change of using some products, so it’s an outcome. Option D is the measurable positive consequence of a project, so it’s a benefit.
Incorrect
An output from a project is the specialist product the project produces. Option B, new computer software, might be an output from a project. Option A, benefits management approach, is an example of a management product, not a specialist product. Option C is the result of the change of using some products, so it’s an outcome. Option D is the measurable positive consequence of a project, so it’s a benefit.
-
Question 15 of 30
15. Question
Which of these options is a minimum requirement for managing business justification for the project?
Correct
The project manager records management actions that need to be put into place to ensure that the project’s outcomes are achieved in the benefits management approach (option D). Option A is a minimum requirement of the plans theme, option B is a minimum requirement of the quality theme, and option C is a minimum requirement of the change theme.
Incorrect
The project manager records management actions that need to be put into place to ensure that the project’s outcomes are achieved in the benefits management approach (option D). Option A is a minimum requirement of the plans theme, option B is a minimum requirement of the quality theme, and option C is a minimum requirement of the change theme.
-
Question 16 of 30
16. Question
Which of the following is the purpose of the business case theme?
Correct
One of the purposes of the business case theme is to establish and review the viability of the project throughout the initiative (option A). Option B is the purpose of the quality theme, option C is the purpose of the organization theme, and option D is a purpose of the risk theme.
Incorrect
One of the purposes of the business case theme is to establish and review the viability of the project throughout the initiative (option A). Option B is the purpose of the quality theme, option C is the purpose of the organization theme, and option D is a purpose of the risk theme.
-
Question 17 of 30
17. Question
Which of the following is the purpose of the benefits management approach?
Correct
The benefits management approach describes both how and when the benefits will be reviewed and also how the performance of the project’s products will be reviewed. This is because it plans how to measure the returns from the project and plans any management actions that need to take place (often post-project) to ensure the project’s products are used as envisioned
Incorrect
The benefits management approach describes both how and when the benefits will be reviewed and also how the performance of the project’s products will be reviewed. This is because it plans how to measure the returns from the project and plans any management actions that need to take place (often post-project) to ensure the project’s products are used as envisioned
-
Question 18 of 30
18. Question
Which of the following is one of the benefits of product-based planning?
Correct
Product-based planning helps to identify the products that are in and out of the scope of the plan by creating tools such as the product breakdown structure. A product-based planning approach ensures that the project management team is very clear about which products will be created before they start to plan the necessary activities and resources.
Incorrect
Product-based planning helps to identify the products that are in and out of the scope of the plan by creating tools such as the product breakdown structure. A product-based planning approach ensures that the project management team is very clear about which products will be created before they start to plan the necessary activities and resources.
-
Question 19 of 30
19. Question
Which one of the following is the first step in the recommended approach to defining and analyzing the products?
Correct
Creating a project product description is the first step in the recommended approach to defining and analyzing the products. Defining and analyzing the products should be done at least once before going on to the next steps. The next three steps—identifying activities and dependencies, preparing estimates, and preparing a schedule—are primarily focused on what PRINCE2 calls activity-based planning. So in the approach to planning, there is both product-based planning, which focuses on what to create and activity-based planning, which focuses on how to create the products.
Incorrect
Creating a project product description is the first step in the recommended approach to defining and analyzing the products. Defining and analyzing the products should be done at least once before going on to the next steps. The next three steps—identifying activities and dependencies, preparing estimates, and preparing a schedule—are primarily focused on what PRINCE2 calls activity-based planning. So in the approach to planning, there is both product-based planning, which focuses on what to create and activity-based planning, which focuses on how to create the products.
-
Question 20 of 30
20. Question
In which of the following steps in the approach to planning does PRINCE2 recommend using the product-based planning approach?
Correct
The product-based planning approach is recommended to help define and analyze products. Defining and analyzing the products is done at least once before going on to the next steps. The next three steps—identifying activities and dependencies, preparing estimates, and preparing a schedule—are primarily focused on what PRINCE2 calls activity-based planning. So in the approach to planning, there is both product-based planning, which focuses on what to create and activity-based planning, which focuses on how to create the products.
Incorrect
The product-based planning approach is recommended to help define and analyze products. Defining and analyzing the products is done at least once before going on to the next steps. The next three steps—identifying activities and dependencies, preparing estimates, and preparing a schedule—are primarily focused on what PRINCE2 calls activity-based planning. So in the approach to planning, there is both product-based planning, which focuses on what to create and activity-based planning, which focuses on how to create the products.
-
Question 21 of 30
21. Question
Which of the following options does PRINCE2 recommend in designing a plan step of the approach to planning?
Correct
Option A would take place in defining and analyzing the products step. Option B would take place in the preparing estimates step. Option C would take place in analyzing risks to a plan step.
Incorrect
Option A would take place in defining and analyzing the products step. Option B would take place in the preparing estimates step. Option C would take place in analyzing risks to a plan step.
-
Question 22 of 30
22. Question
Which of the following options is a factor to consider when structuring the project into management stages?
Correct
It may be a requirement to align the end of a management stage with a programme milestone review. This will allow the project to contribute fully to the assessment of the ongoing viability of the programme.
Incorrect
It may be a requirement to align the end of a management stage with a programme milestone review. This will allow the project to contribute fully to the assessment of the ongoing viability of the programme.
-
Question 23 of 30
23. Question
Which one of the following levels of plans might be created by organizations that are not following the PRINCE2 method?
Correct
The team plan may be created by teams that are working for separate organizations following different project management methods. The team plan is optional, however, as the stage plan alone may provide enough detail for the team.
Incorrect
The team plan may be created by teams that are working for separate organizations following different project management methods. The team plan is optional, however, as the stage plan alone may provide enough detail for the team.
-
Question 24 of 30
24. Question
How do the plans theme help to implement the manage by exception principle?
Correct
The manage by exception principle is implemented by specifying that each PRINCE2 plan includes time, cost, and scope tolerances. Option A describes how the plans theme implements the learn by experience principle. Option B describes how the plans theme implements the manage by stages principle. Finally, option D describes how the plans theme implements the focus on products principle.
Incorrect
The manage by exception principle is implemented by specifying that each PRINCE2 plan includes time, cost, and scope tolerances. Option A describes how the plans theme implements the learn by experience principle. Option B describes how the plans theme implements the manage by stages principle. Finally, option D describes how the plans theme implements the focus on products principle.
-
Question 25 of 30
25. Question
Which of these options is a minimum requirement for managing the plans of the project?
Correct
A minimum requirement of the plans theme is that a project must have at least two management stages (option A). Option B is a minimum requirement of the quality theme. Option C is a minimum requirement of the change theme. Option D is a minimum requirement of the business case theme.
Incorrect
A minimum requirement of the plans theme is that a project must have at least two management stages (option A). Option B is a minimum requirement of the quality theme. Option C is a minimum requirement of the change theme. Option D is a minimum requirement of the business case theme.
-
Question 26 of 30
26. Question
From the list outlined below, which of the following statements is a definition of customer quality expectations?
Correct
Customer quality expectations give a high-level description of the overall outputs of the project and the quality expected of those outputs (option C). Option A is incorrect—the quality register would show a summary of the quality activities planned for the project. Option B is incorrect—a product description’s quality criteria would describe the measurable attributes of a product. Option D is incorrect—the measurable improvement resulting from an outcome is a benefit.
Incorrect
Customer quality expectations give a high-level description of the overall outputs of the project and the quality expected of those outputs (option C). Option A is incorrect—the quality register would show a summary of the quality activities planned for the project. Option B is incorrect—a product description’s quality criteria would describe the measurable attributes of a product. Option D is incorrect—the measurable improvement resulting from an outcome is a benefit.
-
Question 27 of 30
27. Question
Which of the following principle is being applied when quality criteria are specified in product descriptions?
Correct
Quality criteria specify the measurable attributes that will make a product fit for its purpose. Therefore, specifying quality criteria helps the project management team apply the focus on products principle.
Incorrect
Quality criteria specify the measurable attributes that will make a product fit for its purpose. Therefore, specifying quality criteria helps the project management team apply the focus on products principle.
-
Question 28 of 30
28. Question
Which of the following statement describes a minimum requirement for applying the quality theme?
Correct
One of the minimum requirements for applying the quality theme is collecting quality records after each quality test has been carried out on a product. These quality records could be in any format—for example, a form signed by the reviewer—but should always provide evidence that the quality activity occurred. The other options—using the quality review technique, quality inspections, and in-process and appraisal methods—are possible ways of carrying out quality control but are not mandatory requirements of the quality theme.
Incorrect
One of the minimum requirements for applying the quality theme is collecting quality records after each quality test has been carried out on a product. These quality records could be in any format—for example, a form signed by the reviewer—but should always provide evidence that the quality activity occurred. The other options—using the quality review technique, quality inspections, and in-process and appraisal methods—are possible ways of carrying out quality control but are not mandatory requirements of the quality theme.
-
Question 29 of 30
29. Question
Which one of the following options is the purpose of the project product description?
Correct
The project product description defines what the project will need to deliver in order for it to be acceptable to the users (option A). Option B is incorrect—the quality management approach describes the management approach, which helps the project deliver products that will be fit for their purpose. Option C is incorrect—the risk management approach defines how the project will control uncertainty. Option D is incorrect—the change management approach defines how the project will control proposed modifications to the project’s products.
Incorrect
The project product description defines what the project will need to deliver in order for it to be acceptable to the users (option A). Option B is incorrect—the quality management approach describes the management approach, which helps the project deliver products that will be fit for their purpose. Option C is incorrect—the risk management approach defines how the project will control uncertainty. Option D is incorrect—the change management approach defines how the project will control proposed modifications to the project’s products.
-
Question 30 of 30
30. Question
Which of the following is achieved by implementing, monitoring, and recording the quality methods of the project?
Correct
Quality control is about checking that the project’s products have been created correctly. This is done by using quality methods, which are different ways of comparing a product to its quality criteria and keeping evidence that the quality checks have taken place in the form of quality records and entries in the quality register.
Incorrect
Quality control is about checking that the project’s products have been created correctly. This is done by using quality methods, which are different ways of comparing a product to its quality criteria and keeping evidence that the quality checks have taken place in the form of quality records and entries in the quality register.