Quiz-summary
0 of 30 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
Information
Certdemy Premium Access
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 30 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- Answered
- Review
-
Question 1 of 30
1. Question
Which of the following preferences has been given more attention in the Agile Manifesto in contrast to the traditional methods?
Correct
Agile Manifesto focuses on interactions among people rather than relying on tools only
Incorrect
Agile Manifesto focuses on interactions among people rather than relying on tools only
-
Question 2 of 30
2. Question
There are various Agile methods, but from the people’s perspective, which one of them requires the whole team to be technically sound?
Correct
XP stands for extreme programming and requires a very technical sound team with good collaboration among the team members.
Incorrect
XP stands for extreme programming and requires a very technical sound team with good collaboration among the team members.
-
Question 3 of 30
3. Question
Which constituents are peculiar for a manager towards imperative ideality in the business strategy?
Correct
Business strategy includes the best customer care with better communication and productive outcomes. The main objective works around benefitting all the stakeholders along with achieving the milestones.
Incorrect
Business strategy includes the best customer care with better communication and productive outcomes. The main objective works around benefitting all the stakeholders along with achieving the milestones.
-
Question 4 of 30
4. Question
The development team is going through some projects meanwhile the managing director approaches and provide them with some new features to be mentioned in the ongoing iteration process. What should be done by the development team to carry out the task in an efficient way?
Correct
The development team should contact the product owner and after thorough discussion should find a way to include the new feature within the ongoing process.
Incorrect
The development team should contact the product owner and after thorough discussion should find a way to include the new feature within the ongoing process.
-
Question 5 of 30
5. Question
A balance sheet reports a balance between one of the following options:
Correct
A balance sheet consists of three components i.e. risk, value, and capacity, and capability. The value corresponds to linking up the outcomes and the resources. Capacity and Capability define the productivity of the exiting process. Any gap between the first two components is defined under risk.
Incorrect
A balance sheet consists of three components i.e. risk, value, and capacity, and capability. The value corresponds to linking up the outcomes and the resources. Capacity and Capability define the productivity of the exiting process. Any gap between the first two components is defined under risk.
-
Question 6 of 30
6. Question
Many people feel pair programming reduces errors and increases maintainability. What is pair programming?
Correct
In Pair programming, two people share one workstation, typically taking turns typing while the other pays attention and helps
Incorrect
In Pair programming, two people share one workstation, typically taking turns typing while the other pays attention and helps
-
Question 7 of 30
7. Question
Which of the following statement is not a decision-making rule?
Correct
All decisions made are not forced to be based on ethics and follow the law and should be according to policies and regulatory
Incorrect
All decisions made are not forced to be based on ethics and follow the law and should be according to policies and regulatory
-
Question 8 of 30
8. Question
Which of the following Agile term is used to develop rules that decide the intercommunication of employees?
Correct
Working Agreements refer to the standards and rules that each Agile team abides by to work together during the course of the project.
Incorrect
Working Agreements refer to the standards and rules that each Agile team abides by to work together during the course of the project.
-
Question 9 of 30
9. Question
Six Sigma is a method which is used for the purpose of:
Correct
Six sigma provides a method or Solving a problem and countering the flaws by analyzing and tranquilizing errors in an illustrated process control
Incorrect
Six sigma provides a method or Solving a problem and countering the flaws by analyzing and tranquilizing errors in an illustrated process control
-
Question 10 of 30
10. Question
Logical, data, technical and conformance errors can be illustrated as:
Correct
Logical, data, technical and conformance errors can be illustrated as software errors
Incorrect
Logical, data, technical and conformance errors can be illustrated as software errors
-
Question 11 of 30
11. Question
Which of the following statement is correct regarding the White box team in encapsulated scope and methodology?
Correct
The white box is the narrative development of the internal arrangement of the black box. The same team works on the white box which was working on the black box.
Incorrect
The white box is the narrative development of the internal arrangement of the black box. The same team works on the white box which was working on the black box.
-
Question 12 of 30
12. Question
Cost of value, earned value, burned value, economic value, the best value, and free value are the objective measures of:
Correct
The objectives of the “Manage value” are the cost of value, earned value, burned value, economic value, the best value, and free value
Incorrect
The objectives of the “Manage value” are the cost of value, earned value, burned value, economic value, the best value, and free value
-
Question 13 of 30
13. Question
A customer demands 10 units of a product in a week, what will be the Takt time per unit? Assume numbers of hours per week = 40
Correct
Takt time per unit = Total time for production/customer demand= 40/10 =4 hours per unit
Incorrect
Takt time per unit = Total time for production/customer demand= 40/10 =4 hours per unit
-
Question 14 of 30
14. Question
In which of the following situations, the cycle time can be minimized?
Correct
The cycle time can be minimized by maximizing the utilization and working in small batches.
Incorrect
The cycle time can be minimized by maximizing the utilization and working in small batches.
-
Question 15 of 30
15. Question
As the project starts, all the estimations and plans are carefully observed during which phase in the burn-down chart?
Correct
During retrospective planning, all the estimations and plans are carefully observed in the burn-down chart
Incorrect
During retrospective planning, all the estimations and plans are carefully observed in the burn-down chart
-
Question 16 of 30
16. Question
On the burn-down chart, the sequence of the project is maintained on:
Correct
On the burn-down chart, the sequence of the project is maintained on the WIP board
Incorrect
On the burn-down chart, the sequence of the project is maintained on the WIP board
-
Question 17 of 30
17. Question
The mathematical formula which explains that the square of a number of system components increases the potential of intercommunication is named as:
Correct
The mathematical formula which increases the potential of intercommunication is named as the N2 effect.
Incorrect
The mathematical formula which increases the potential of intercommunication is named as the N2 effect.
-
Question 18 of 30
18. Question
The apperceived benefits of Agile methodologies may include which of the following:
Correct
The apperceived benefits of Agile methodologies is the omission of waste by accelerating the delivery
Incorrect
The apperceived benefits of Agile methodologies is the omission of waste by accelerating the delivery
-
Question 19 of 30
19. Question
As far as if one speaks in the favor of Agile methodologies, what is the limitation amongst the following that isn’t very helpful in the case of long-term projects?
Correct
Daily collaboration with users is the main limitation in the case of long-term projects.
Incorrect
Daily collaboration with users is the main limitation in the case of long-term projects.
-
Question 20 of 30
20. Question
Which of the following plan is followed by Agile project management?
Correct
Rolling wave planning is followed by Agile project management.
Incorrect
Rolling wave planning is followed by Agile project management.
-
Question 21 of 30
21. Question
Which of the following Agile term is used to make rules for the interaction of the group mates?
Correct
A working agreement is used to make rules for the interaction of the group mates
Incorrect
A working agreement is used to make rules for the interaction of the group mates
-
Question 22 of 30
22. Question
Scrum, which is one of the most popular methodologies of Agile is based upon a few pillars. what are they amongst the following?
Correct
The pillars are commitment, Focus, Openness, Respect, Courage
Incorrect
The pillars are commitment, Focus, Openness, Respect, Courage
-
Question 23 of 30
23. Question
The abbreviation CRACK which is used to elaborate the adequate product owner (PO) in scrum roles stands for?
Correct
CRACK stands for Committed, responsible, authorized, collaborative and knowledgeable
Incorrect
CRACK stands for Committed, responsible, authorized, collaborative and knowledgeable
-
Question 24 of 30
24. Question
Which statement describes the Agile method the best?
Correct
It is a philosophy which allows the customer and team to communicate and flourish and to transfer working code in a cumulative and iterative way
Incorrect
It is a philosophy which allows the customer and team to communicate and flourish and to transfer working code in a cumulative and iterative way
-
Question 25 of 30
25. Question
Which of the following methodologies follow the Agile principles and values?
Correct
Dynamic systems development methods (DSDM) and Feature-driven development (FDD), Extreme programming (XP) and Scrum, Kanban, Lean and crystal. All of them follow Agile principles.
Incorrect
Dynamic systems development methods (DSDM) and Feature-driven development (FDD), Extreme programming (XP) and Scrum, Kanban, Lean and crystal. All of them follow Agile principles.
-
Question 26 of 30
26. Question
To improve the overall efficiency of the workplace, Lean uses a 5S technique. What is the right order of the “5S”?
Correct
The right order of carrying out the 5S technique is Sort, Set in Order, Shine, Standardize, Sustain
Incorrect
The right order of carrying out the 5S technique is Sort, Set in Order, Shine, Standardize, Sustain
-
Question 27 of 30
27. Question
Which of the following is not the Agile principle?
Correct
The highest preference is given to the customer’s satisfaction throughout the Agile process.
Incorrect
The highest preference is given to the customer’s satisfaction throughout the Agile process.
-
Question 28 of 30
28. Question
In which type of Agile leadership style, the prime focus is on the well being of the people or community?
Correct
the prime focus of the servant leadership style is on the well being of the people or community
Incorrect
the prime focus of the servant leadership style is on the well being of the people or community
-
Question 29 of 30
29. Question
What is the best tool for tracking and reporting the status of schedule and cost?
Correct
S-curve graph is the best tool used for recording all the costs incurring during the project. This will help in determining the expected overall cost of the project at the end of the project.
Incorrect
S-curve graph is the best tool used for recording all the costs incurring during the project. This will help in determining the expected overall cost of the project at the end of the project.
-
Question 30 of 30
30. Question
Suppose you call someone to repair your Air conditioner (AC). For explaining the problem, you took 10 minutes. And the AC repairer took 4 hours to solve your problem. Then after a repair, you took 10 minutes in order to ensure that AC is now working fine. Find out the process cycle efficiency for the repairer and you considering that repairer only values the repair time, whereas you value only the time explaining the issue and checking the AC.
Correct
Total lead time = AC repair time + time for explaining the problem + time for checking the AC
= 4 * 60 minutes + 10 minutes + 10 minutes = 240 + 10 + 10 = 260 minutes
Process cycle efficiency (Engineer) = (AC repair time) / (Total lead time) = 240/260*100 = 92.3%
Process cycle efficiency (you) = (time for explaining the problem + time for checking the AC) / (Total lead time) = 20/260*100 = 7.7%Incorrect
Total lead time = AC repair time + time for explaining the problem + time for checking the AC
= 4 * 60 minutes + 10 minutes + 10 minutes = 240 + 10 + 10 = 260 minutes
Process cycle efficiency (Engineer) = (AC repair time) / (Total lead time) = 240/260*100 = 92.3%
Process cycle efficiency (you) = (time for explaining the problem + time for checking the AC) / (Total lead time) = 20/260*100 = 7.7%