Quiz-summary
0 of 10 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Information
Practice questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
Determine the impedance of the ground fault loop for Circuit 3.
Correct
0.338Ω is the correct answer because of Using the formulae: Zs = Ze + (R1 + R2) × L.
Incorrect
0.338Ω is the correct answer because of Using the formulae: Zs = Ze + (R1 + R2) × L.
-
Question 2 of 10
2. Question
State the number of electrical checks to be conducted by the inspector on an electrical basis device for added security.
Correct
A 30mA RCD is an additional defensive device; it will also be checked on the first and second half cycles of the sinewave input supply (0° and 180 °)
Incorrect
A 30mA RCD is an additional defensive device; it will also be checked on the first and second half cycles of the sinewave input supply (0° and 180 °)
-
Question 3 of 10
3. Question
Provide the number of documents on which the value for the complete installation of external earth fault loop impedance will be registered.
Correct
The number of documents on which the value for the complete installation of external earth is 4.
Incorrect
The number of documents on which the value for the complete installation of external earth is 4.
-
Question 4 of 10
4. Question
What boxes should the inspector tick for the supply of the electrical facility in Section I?
Correct
Section I Number and Type of Electric Live Conductors “Installation Status Report: The inspector is expected to identify the number of “live” conductors that will be the line and neutral conductors (not the CPC) for a single-phase supply, and the supplied form is a.c. There is a chance that the supply polarity box confirmation may be missed.
Incorrect
Section I Number and Type of Electric Live Conductors “Installation Status Report: The inspector is expected to identify the number of “live” conductors that will be the line and neutral conductors (not the CPC) for a single-phase supply, and the supplied form is a.c. There is a chance that the supply polarity box confirmation may be missed.
-
Question 5 of 10
5. Question
For Circuit 1, the short circuit power (Icn) is 6kA. Is this potential for braking compatible with the safety device? What step can the inspector take, if not?
Correct
The value of the prospective current of the fault (Ipf) is not defined Therefore, for this installation, the scenario must be determined from the provided data. The nominal voltage is 230 volts RMS for the installation and the external impedance (Ze) is 0.03, using the Ohms Law equation
Incorrect
The value of the prospective current of the fault (Ipf) is not defined Therefore, for this installation, the scenario must be determined from the provided data. The nominal voltage is 230 volts RMS for the installation and the external impedance (Ze) is 0.03, using the Ohms Law equation
-
Question 6 of 10
6. Question
On the additional security unit, state the purpose of the test button.
Correct
The integral test button of an RCD has only one function; that is, to test the mechanical function of the device, and will not operate unless the RCD is energised
Incorrect
The integral test button of an RCD has only one function; that is, to test the mechanical function of the device, and will not operate unless the RCD is energised
-
Question 7 of 10
7. Question
When either an RCD or Earth Fault Loop Impedance test is performed. What is the appropriate current rating of the protective fuse of the probe?
Correct
The latest version (4th Edition) of GS 38 stipulates that 10AA should be used when performing either an RCD or earth fault loop impedance test, fuse safety for the test instrument’s probes.
Incorrect
The latest version (4th Edition) of GS 38 stipulates that 10AA should be used when performing either an RCD or earth fault loop impedance test, fuse safety for the test instrument’s probes.
-
Question 8 of 10
8. Question
In relation to the additional ring final circuit for the stage area, what action should the inspector take?
Correct
Even though the final circuit of the ring was built 5 years ago and was in the inspector does not presume that the circuit meets the specifications of BS 7671 for continuous use or that it is safe to use, even though it is in current use. The inspector must then carry out the initial verification and complete the necessary documentation: the certificate of electrical installation and the related timetables.
Incorrect
Even though the final circuit of the ring was built 5 years ago and was in the inspector does not presume that the circuit meets the specifications of BS 7671 for continuous use or that it is safe to use, even though it is in current use. The inspector must then carry out the initial verification and complete the necessary documentation: the certificate of electrical installation and the related timetables.
-
Question 9 of 10
9. Question
When evaluating the electrical installation, including the first three instrument tests and the corresponding instrument used.
Correct
Continuity of protective conductors, including primary and additional conductors bonding, continuity of conductors of the ring final circuit, and insulation Resistance: Low-resistance ohmmeter and resistance meter for insulation is used.
Incorrect
Continuity of protective conductors, including primary and additional conductors bonding, continuity of conductors of the ring final circuit, and insulation Resistance: Low-resistance ohmmeter and resistance meter for insulation is used.
-
Question 10 of 10
10. Question
Mounted and linked to the metallic oil and water installation pipework were 10 mm2 main protective bonding conductors. Provide the primary earth conductor with the recommended csa.
Correct
In the scenario, the bonding conductor’s csa is given but not that Conductor of the line.
Incorrect
In the scenario, the bonding conductor’s csa is given but not that Conductor of the line.